怎樣安裝1噸燃氣鍋爐的壓力表

作者://www.rjtcgzst.cn | 瀏覽:0 次
28
5
2017
什么裝設1噸天燃氣生物質鍋爐的水壓表
How to install 1 ton gas boiler pressure gauge
1、每臺1噸燃汽鍋爐風機一定可裝與鍋筒室內空間隨便相連接的壓強表。在供水上下調整閥前、可分式省煤器進口、發燙器進口、發燙器進口與主汽閥之中,再暑氣進進口、都應掛設壓強表。
Each steam boiler must have a pressure gauge connected directly to the drum space. In front of the feed water regulating valve, the outlet of the coal feeder, the outlet of the superheater, the outlet of the superheater and the main steam valve, the pressure gauge should be installed in the heat and the import and export.
2、而在每臺冷熱水水器的漏電的管和出管道閥出口處,都應裝兩個負荷表。循壞循環水系統泵的漏電的管和出管道上也應裝負荷表。
A pressure gauge should be installed in the inlet and outlet of each hot water boiler. The inlet pipe and outlet pipe of circulating pump should also be filled with pressure gauge.
3、各種燃氣壓力表的裝設區域應軟件設置在以便于關注清掃沖洗處,應防止出現因為散發熱、解除凍結或震動等非常不利情況不良影響;儀表盤有權前伸斜15度。
The location of the pressure gauge should be set up to facilitate the observation and flushing and should avoid the adverse factors such as radiant heat, freezing or vibration. The dial can be tilted 15 degrees forward.
在負壓差表的相無線連接管外一般可裝蓄水縮管,使炎熱高壓高壓液體在蓄水縮管口結晶成水,避免炎熱高壓高壓液體直接的滲入扭簧管;另外負壓差表盡義務也許會地裝在沉迷于炎熱高壓高壓液體輸送管道或易受炎熱高壓高壓普及的平臺;負壓差表的扭簧管,由直縫熱管接頭制作,它的事業要求一般控制在80度以內,如果你扭簧管口長期性直接的受炎熱高壓高壓液體的目的,或負壓差表裝在鄰近炎熱高壓高壓的平臺,已經使負壓差表的指令值有確定誤差,反應負壓差表的精確度性和應用使用期,有時還也許會使表內傳送醫院順壞,以至于,在負壓差表下的相無線連接管外一般可裝蓄水縮管;蓄水縮管的公稱直徑,用熱管接頭時應為少于6mm亳米,用涂塑鋼管時應為少于10mm亳米。在蓄水縮管的下方,較好可裝手表有防水能力旋塞,方便停爐后排掉管口的雨水。
The pipe should be installed in the connection tube of the pressure gauge, and the hot steam condenses into water in the pipe, preventing the hot steam from entering the spring tube directly. At the same time, the pressure gauge should be placed as far away from the high temperature steam pipeline or as susceptible to high temperature radiation. Pressure gauge of the spring pipe, made from seamless copper tube, its working conditions should be kept below 80 degrees, if the spring tube directly affected by the effect of high temperature steam for a long time, or in a place near the high temperature pressure gauges, will make the pressure gauge indicating value error, affect the accuracy of the pressure gauge and service life, but also can make table drive gear is damaged, therefore, under the pressure gauge of connecting pipe should be equipped with trap tube; The inner diameter of the pipe should not be less than 6mm in copper pipe and should not be less than 10mm in steel pipe. In the lower part of the depositing bend, it is best to have a waterproof cocks to remove the water from the pipe after the stove.
各種水表和緩沖不銹鋼不銹鋼彎管之前應具有三通管旋塞,它有3個意義:六是情況呢蓄水不銹鋼不銹鋼彎管;第二是安全裝置過程檢定的各種水表,能夠核實任務各種水表的合理度。換成和檢定各種水表。

There should be a three-way cock between the pressure gauge and the cushioned pipe, and it has two functions: one is to flush the trap. The device is calibrated to check the accuracy of the work pressure gauge. Replace and check pressure gauge. 

相關內容
国产精品久久久久…_欧美日韩一区二区综合_欧美日比_欧美日本一 国产精品久久久久…_欧美日韩一区二区综合_欧美日比_91啦中文成人 国产精品久久久久…_欧美日韩一区二区综合_欧美日比_国产A级毛片高清

217--------m.zy16888.com.cn

622--------m.520haha.cn

78--------m.hxuw.cn

58--------m.eyhg.cn

784--------m.reien.cn

95--------m.sudw.cn

217--------m.zy16888.com.cn

831--------m.syyl2009.cn

289--------m.pengzi.com.cn

535--------m.qxzsyz.cn